施作于新浇注的整体粉光地坪表面 |
添加时间:2018/4/12 17:15:47 浏览次数: |
施作于新浇注的整体粉光地坪表面: Applied to the surface of the newly built whole powder light floor surface: 1. 新浇筑混凝土地坪必须经过至少3天的养护,最好是7天以上。 1., the new concrete floor must be maintained for at least 3 days, preferably 7 days. 2. 低压喷涂混凝土密封固化剂(标准用量:0.1KG/m2),随后用超细纤维拖把或软毛扫帚将材料分配均匀,勿积料。 2. low pressure spray concrete seal curing agent (standard dosage: 0.1KG/m2), then use ultrafine fiber mop or soft broom to distribute material evenly, do not accumulate material. 3. 地坪表面需保持15-20分钟的润湿状态。 3., the surface of the floor should be kept wet for 15-20 minutes. 4. 多孔隙地坪及已呈现吸干材料区域的地坪,需追加喷涂。 4., the porous floor and the floor with dry material area need additional spraying. 5. 一旦材料开始硬化时,不可再用超细纤维拖把或软毛扫帚。 5. once the materials began to harden, will not be able to use the microfiber mop or soft broom. 6. 材料干燥时间:约2-4小时。 6. drying time: about 2-4 hours. 施作于研磨抛光的混凝土地坪表面: Applied to the surface of the ground floor of the grinding and polishing concrete: 1. 研磨抛光至200目(湿磨或干磨)。 1. grinding and polishing to 200 mesh (wet or dry grinding). 2. 施作第一道混凝土密封固化剂材料,用量:0.1KG/m2,施工法同上。 2., the first concrete sealing and curing agent material is applied. The dosage is 0.1KG/m2, and the construction method is the same as above. 3. 研磨抛光至400目(湿磨或干磨)。 3. grinding and polishing to 400 mesh (wet or dry grinding). 4. 研磨抛光至800目(干磨)。 4. grinding and polishing to 800 mesh (dry grinding). 5. 施作第二道混凝土密封固化剂材料,用量:0.1KG/m2,施工法同上。 5., second concrete sealing and curing agent materials are applied, the dosage is 0.1KG/m2, and the construction method is the same as above. 6. 研磨抛光至1500目(干磨)。 6. grinding and polishing to 1500 mesh (dry grinding). 7. 研磨抛光至3000目(干磨)。 7. grinding and polishing to 3000 mesh (dry grinding). |
上一页 选用混凝土密封固化剂 |
下一页 混凝土密封固化剂施工方法 |
Copyright © 技术支持:遨游网络