返回首页

保定市固化剂厂

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
密封固化剂施工中的注意事项
添加时间:2019/4/17 16:58:31     浏览次数:
1.旧地面应先除去表面涂层(如蜡层、养护剂、树脂类涂料等)及油污。重度油污的地面,需经过适当的处理后才可施工高渗透密封固化剂。
1. Old floors should first remove surface coatings (such as wax, curing agents, resin coatings, etc.) and peidiany.89ix.compeidiang.89ix.comkaiguanguig.89ix.comjiliangx.89ix.comoil stains. High permeability keliji.89ix.compeidianx.89ix.comsealant curing agent can only be applied to the ground with heavy oil pollution after proper treatment.
2.施工温度:2℃<地面温度<50℃
2. Construction Temperature: 2 <Ground Temperature<50 <
3.包装桶密封,0℃以上保存,存储期不限,若有浑浊现象,使用前摇匀即可。
3. Packing barrel is sealed and stored above 0 C. The storage period is unlimited. If there is turbidity, shake well before use.
4.运输时检查包装是否完整、密封,发生泄漏时用大量水冲洗。
4. Check whether the package is complete and sealed during transportation, and rinse it with plenty of water when leakage occurs.
5.此产品无腐蚀性,无毒、无味;但注意不能长时时间浸泡在高渗透密封固化剂里,避免儿童接触。
5. This product is non-corrosive, non-toxic and tasteless, but it should not be immersed in high permeability sealant for a long time to avoid children's contact.
上一页  固化剂的品种对固化物的性能有哪些影响  
下一页  混凝土密封固化剂地坪如何清洗保洁?
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3