返回首页

保定市固化剂厂

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
对于起砂地面进行清扫,无浮灰,保持干燥
添加时间:2019/6/4 15:11:53     浏览次数:
1、基层要求:对于起砂地面进行清扫,无浮灰,保持干燥(可允许潮湿,但不得有明水);   裂缝及缺损部位应用工程师灌浆系列及A3高强修补料修补后,统一用A5混凝土硬化剂   进行硬化处理。
1. Basic requirements: Clean sand-raising ground without floating ash, keep dry (moisture is allowed, but no clear water); apply engineer grouting series and A3 high-strength repair material to repair cracks and defects, and then use A5 concrete hardener to harden.
2、增硬处理:直接喷洒1#料,保证基层充分浸润吸收,随时补充被吸收的1#料,保持浸润状态,使   整个地面完全浸透;   随时将低洼处多余的1#料扫至已吸收处,应保证2小时内基层充分吸收1号料,且不应   有余料堆积;   起砂严重的地面可连续三天重复喷洒1#料一遍。
2. Hardening treatment: direct spraying of 1# material to ensure full infiltration and absorption of the grass-roots, replenishing absorbed 1# material at any time, keeping the infiltration state, so that the whole ground is completely soaked; sweeping the excess 1# material at any time to the absorbed place in the low-lying place, should ensure that the grass-roots absorb 1# material fully within 2 hours, and there should be no accumulation of excess material; and the ground with serious sand can be repeatedly sprayed 1 Once again.
3.耐磨处理:1#料施工至少48小时后采用2#料直接涂刷于经过增硬处理的地面,一遍即可,应均匀   饱满,不需养护,7天后可正常使用。
3. Wear-resistant treatment: 1. After construction for at least 48 hours, 2 # material is directly applied to the ground after hardening treatment, once, it should be even and full, without maintenance, and can be used normally after 7 days.
上一页  混凝土密封固化剂的施工工艺  
下一页  混凝土密封固化剂又称渗透型密封硬化剂
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3