混凝土密封固化剂地坪施工方案 |
添加时间:2020/7/6 14:18:46 浏览次数: |
混凝土密封固化剂地坪施工方案 Concrete sealing curing agent floor construction scheme 1.新水泥地面养护两周/水磨石养护7-10天,清理掉混凝土地面上的污物(例如水泥渣、油漆块、垃圾、灰尘等)。 1. Maintain the new cement floor for two weeks / terrazzo for 7-10 days, and remove the dirt on the concrete floor (such as cement slag, paint block, garbage, dust, etc.). 2.用水彻底清洗地面,待地面八成干以上即可施工MKF002-01混凝土密封固化剂。以约0.2㎏/㎡的用量将产品喷涂在地面上,用尘推推均匀,让固化剂尽可能渗透到混凝土内部。 2. Clean the ground thoroughly with water, and the mkf002-01 concrete sealing curing agent can be applied after the ground is 80% dry. Spray the product on the ground with a dosage of about 0.2kg/m2, push it evenly with dust, and let the curing agent penetrate into the concrete as much as possible. 3.在施工1~2小时后,若检查发现低处还存有残留的固化剂,应从低处推到干燥区域或是从表面完全清除掉。 3. After 1-2 hours of construction, if it is found that there is still residual curing agent at the low place, it should be pushed to the dry area or completely removed from the surface. 4.施工时间:约3小时,施工完毕,地坪干燥即可行走。通风干燥3天后再用树脂磨片(通常300-1000目)抛光,亮度呈现较强光泽。 4. Construction time: about 3 hours. After the construction, the floor can be dry and walk. After ventilation and drying for 3 days, the resin grinding plate (usually 300-1000 mesh) is used for polishing, and the brightness shows strong luster. |
上一页 混凝土密封固化剂是一种什么产品 |
下一页 前期介入保证混凝土地坪的施工是很有必要的 |
Copyright © 技术支持:遨游网络